Arrowhead Water Bottling Plant

Cabazon, CA

Client

Nestle Waters North America

Size

390,000 sq. ft.

Completion

2004

MSA Consulting, Inc. was retained to perform all of the civil engineering design and surveying services for the 1 million square foot Arrowhead Water Bottling Facility. The project in Cabazon is located on Indian land within the Reservation of the Morongo Band of Mission Indians. It was the first building in the Tribe’s planned Morongo Intermodal Transload and Industrial Center (MITIC), an ambitious master-planned industrial park. The Arrowhead Water Bottling Facility for Nestle Waters North America represents a further refinement and knowledge development of the LEED (Leadership in Energy and Environmental Design) program. The Cabazon plant received a LEED Silver certification.

Additional Projects

Residential

Carlos Ortega Villas

MSA originally determined site constraints and prepared a conceptual grading and drainage plan for this seventy-three unit senior rental housing development in Palm

Read More »
Hotels and Resorts

Mayflower Park

Mayflower Park, located on 80 acres on the Colorado River Road in Blythe, CA, features 152 campsites with water, electricity, and

Read More »